    目的 为安全回收副斜井保护煤柱压覆煤炭资源,研究单元密实充填开采过程中副斜井变形与应力响应规律。
    方法 以榆神府某矿1305工作面为工程背景,采用FLAC3D建立三维模型,模拟“采8 m、留24 m”四阶段采充全过程,分析副斜井位移场和应力场演化,并开展井筒全采动周期现场监测验证。
    结果 采充完成后,井筒最大竖向沉降为11.1 mm,X、Y向水平变形均不足2 mm,应力仅小幅波动,未出现明显应力集中;实测最大累计沉降为9.446 mm,倾斜变形普遍低于3 mm/m,最大曲率小于0.3 mm/m2,各项指标均满足建(构)筑物Ⅰ级保护标准,实测与模拟结果总体一致。
    结论 通过预留煤柱与固结充填体协同承载,可有效抑制覆岩运移和采动扰动,在保障副斜井稳定的前提下实现压覆煤炭资源安全回收,可为榆神府及同类矿区斜井下压煤充填开采提供理论支撑与现场技术参考。

     

    Abstract: To safely recover the coal resources trapped under the protective coal pillar of the auxiliary inclined shaft, the deformation and stress response patterns of the shaft during unitized dense backfill mining are investigated. Taking the 1305 working face of a mine in the Yushenfu area as the engineering background, a three-dimensional model was established using FLAC3D to simulate the full four-stage mining and backfilling process with a “mining 8 m and leaving a 24 m pillar” layout. The evolution of the displacement and stress fields of the auxiliary inclined shaft was analyzed, and on-site monitoring covering the entire mining period was conducted for verification. After the completion of mining and backfilling, the maximum vertical settlement of the shaft was 11.1 mm, the horizontal deformations in both the X and Y directions were less than 2 mm, and the stress fluctuated only slightly without obvious stress concentration. The measured maximum cumulative settlement was 9.446 mm, the inclination deformation was generally lower than 3 mm/m, and the maximum curvature was less than 0.3 mm/m2. All indicators satisfy the Grade I protection standard for buildings (structures), and the measured results are generally consistent with the simulated ones. Through the synergistic bearing of the reserved coal pillar and the consolidated backfill, the overlying strata movement and mining-induced disturbance can be effectively suppressed, thereby achieving the safe recovery of the trapped coal resources while ensuring the stability of the auxiliary inclined shaft.

     

/

返回文章
返回